<html>
  <head>
    <meta content="text/html; charset=ISO-8859-1"
      http-equiv="Content-Type">
  </head>
  <body bgcolor="#FFFFFF" text="#000000">
    (Resending from an address actually on this list..)<br>
    <br>
    Go to WI-30 -- 151 (East Washington Ave) is under construction for
    the couple miles from the exit off the interstate.<br>
    <br>
    If the traffic isn't bad, it won't matter too much, but if the
    traffic is bad, the construction would be a real pain.<br>
    <br>
    Even without the construction it is often easier and quicker to go
    around on 30, due to traffic around East Towne mall and the
    businesses along 151 as you come in.  Just watch the exit from 30 to
    151/E Washington, it kinda sneaks up on you and is a hard right turn
    (it's just past the Fair Oaks exit after you go under the bridge). 
    Never fear if you miss it, just stay on 30 to Packers Ave, which
    (when taken South -- left) winds a bit at first (and changes names a
    couple times), but comes right down to the University (becoming
    University Ave).<br>
    <br>
    Any time that isn't winter is construction season around here, and
    several major roads are under construction.  If you're coming from
    the South (via 12/18), Fish Hatchery Rd is completely closed, take
    Park St (likely what map software would give you anyway).  Coming
    from the West, University Ave is under heavy construction (1 lane
    each way with few turn lanes), if you're unfamiliar, probably best
    to take 12/18 around to Park St (12/18 is under construction part of
    that way, but it's less harrowing, especially in the dark).<br>
    <br>
    City of Madison construction info (no map -- did we lose a war??): <a
      class="moz-txt-link-freetext"
      href="http://www.cityofmadison.com/transportation/roadworks/">http://www.cityofmadison.com/transportation/roadworks/</a><br>
    State of Wisconsin construction info (useless map): <a
      class="moz-txt-link-freetext"
      href="http://www.dot.wisconsin.gov/travel/road/workzones.htm">http://www.dot.wisconsin.gov/travel/road/workzones.htm</a><br>
    (Seems like the City and State info are begging to be hacked
    together in to a useful map of some sort..)<br>
    <br>
    jon<br>
    <br>
    PS, right at the moment, Google is suggesting taking the exit to 51
    (which intersects with 151) when you're coming down from the North,
    which is surprising to me, but would also avoid the construction on
    151 (in exchange for construction at the interchange.)<br>
    <br>
    <br>
    On 6/11/12 8:38 PM, Scott Hildreth wrote:
    <blockquote
      cite="mid:1339465111.16732.YahooMailRC@web184411.mail.bf1.yahoo.com"
      type="cite">
      <style type="text/css"><!-- DIV {margin:0px;} --></style>
      <div style="font-family:times new roman,new
        york,times,serif;font-size:12pt">
        <div>
          <pre><font size="2">Does anyone know if it is "more better" to exit at 12-18 west to 151 North or
take 90 to WI-30 West to 151 South (Google Map's Directions)?

Thanks,

Scott</font>
</pre>
        </div>
      </div>
      <br>
      <fieldset class="mimeAttachmentHeader"></fieldset>
      <br>
      <pre wrap="">_______________________________________________
yapc mailing list
<a class="moz-txt-link-abbreviated" href="mailto:yapc@pm.org">yapc@pm.org</a>
<a class="moz-txt-link-freetext" href="http://mail.pm.org/mailman/listinfo/yapc">http://mail.pm.org/mailman/listinfo/yapc</a>
</pre>
    </blockquote>
    <br>
    <pre class="moz-signature" cols="72">-- 
.Jonathan J. Miner------------------Division of Information Technology.
|<a class="moz-txt-link-abbreviated" href="mailto:miner@doit.wisc.edu">miner@doit.wisc.edu</a>                 University Of Wisconsin - Madison|
|608/262.9655                               Room 3148 Computer Science|
`---------------------------------------------------------------------'
</pre>
  </body>
</html>